Builders & main contractors
Main contracting runs on paperwork discipline: tender packs in, valuations out, subcontractors sequenced and a final account that reconciles. The workspace is set up for that rhythm from day one.
How a job runs in this trade
These stages arrive pre-set and can be renamed, reordered or removed to match how you work.
- 01Enquiry
- 02Tender review
- 03Contract & pre-start
- 04Groundworks
- 05Structure
- 06First fix
- 07Second fix
- 08Snagging
- 09Final account
Documents, take-offs and material packs
Every document is produced as a draft for the competent person to check before it is issued.
Document drafts
- Construction phase plan draft
- RAMS
- Subcontract order
- Valuation & payment notice
- Variation register
- Handover pack
Take-offs
- Floor areas & volumes
- Blockwork and brick counts
- Concrete volumes
- Openings schedule
Material packs
- Aggregates & concrete
- Blocks, bricks & lintels
- Structural timber
- Insulation & membranes
Quick wins
- Tender pack analysis
- Stage payment tracking
- Subcontractor scheduling
Which parts of the platform do the work
Sonny routes the job to the right specialist agent and keeps you in the approval seat.
Two-storey rear extension
Tender pack read, stage payments planned, subcontractors sequenced.
Commercial refurbishment
Valuations, variations and a reconciled final account.
Set up for these too
Trade configuration accelerates drafting only. Certification, notifiable work, statutory inspections and compliance sign-off remain with the competent person or registered body.